JR News

香港JR设计 HK JR Design-大西安项目进展

On the 13th of this month, the sixth coordination meeting of the government of the Great Xi 'an Aluminum Flyover Project of the Sixth Metallurgical and JR Guiyang Institute was held as scheduled, and the construction will start soon!At the same time, the Xi 'an project led by JR and the First Metallurgical Corporation, China Construction Third Engineering Bureau and China Railway Bridge Bureau has entered the stage of scheme approval, with a total construction amount of about 10 billion yuan!At the same time, JR led the cooperation of China Construction Corporation, No. 1 Metallurgical Corporation, China Railway Corporation, North Industries Corporation in the Greater Bay Area, the Yangtze River Basin project has been carried out as scheduled!

 

本月十三号,六冶和JR,贵阳院的大西安铝天桥项目政府第六次协调会如期举行,近期将启动施工!同时,JR牵头和一冶,中建三局,中铁大桥局的西安项目已进入方案通过阶段,总计约一百亿施工额!同时,JR牵头合作的中建,一冶,中铁,兵器工业总公司在大湾区,长江流域的项目也如期展开!




返回